Control / Change Order 2 (Mid-Level)
STREET LEGAL INDUSTRIES INC
Washington, DC, USA
6/14/2022
Full Time
Job Description
Job DescriptionDescription:
- $150M+ New Federal (GSA, DoD) Construction Experience
- Experience documenting and evaluating changes in project cost, schedule, evaluating contractors request for change order and preparing written reports on project status
- Able to read construction drawings
- Maintains records on project costs, time schedules, contractor performance, and contract changes
Requirements:
- 5+ Years in role as a Project Manager/Project Engineer
- BS Construction Management or Engineering or BA Architecture
- Must be able to speak and write in English
- Must be able to obtain HSPD-12
- Onsite